Municipal — Domestic + Industrial
Kitchener Drainage Canal WWTP
📍 Cairo, Egypt
Process design & commissioning advisory for one of the world's largest treatment plants — domestic + industrial flows.
700,000 m³/day — 1.2M residents
Projects
Domestic and industrial water infrastructure at every scale — from 400 m³/day community plants to 700,000 m³/day metropolitan facilities.
From the Kitchener Drainage Canal in Cairo — one of the world's largest treatment complexes — to remote First Nations communities in Northern Ontario, BioTerraVa has delivered water and wastewater infrastructure across four continents. Every project reflects the same senior P.Eng. discipline: design for the worst day, not the average day.
Municipal — Domestic + Industrial
📍 Cairo, Egypt
Process design & commissioning advisory for one of the world's largest treatment plants — domestic + industrial flows.
700,000 m³/day — 1.2M residents
Industrial — Design-Build
📍 Tampa, Florida, USA
Design-build expansion of an industrial zone treatment facility with nutrient removal upgrade.
65,000 → 150,000 m³/day
Municipal — Domestic
📍 Riyadh, Saudi Arabia
Nine-year operations leadership of municipal sewage treatment infrastructure with full O&M organization.
360+ staff under management
Municipal — Domestic
📍 Ontario, Canada
Capacity audits, ECA amendments and expansion design for growing Ontario municipalities.
400 – 50,000 m³/day
Industrial — Heavy Metals
📍 Ontario, Canada
Heavy metals source control and end-of-pipe treatment strategy for integrated steel operations.
Multi-outfall industrial program
Indigenous Communities
📍 Northern Ontario, Canada
Packaged treatment systems, operator training and long-term advisory for remote communities.
500 – 5,000 residents
Deep Dive
Three engagements that show how senior-engineer delivery changes outcomes.
Municipal · Ontario
A 25,000 m³/day Ontario municipal plant was facing overflow events and had budgeted $4M for a parallel train. BioTerraVa conducted a 6-week capacity audit using BioWin process simulation, hydraulic profiling, and I/I monitoring.
Outcome: Identified 35% hidden capacity through aeration optimization, sidestream management, and clarifier baffle upgrades. The expansion was deferred by 4 years, saving the municipality $3.2M in capital while maintaining ECA compliance.
Industrial · Steel
An integrated steel mill in Ontario was receiving MECP attention for zinc and nickel exceedances across three outfalls. BioTerraVa designed a source-segregation and chemical-precipitation strategy.
Outcome: Segregated concentrated pickle-line streams at source, implemented pH-optimized precipitation (Zn at pH 9.5, Ni at pH 10.2), and added ion-exchange polishing. All outfalls now compliant; filter-press dewatering reduced sludge hauling by 22%.
Indigenous · Northern Ontario
A First Nation community of 800 residents needed a new drinking water system to replace failing wells. BioTerraVa designed a packaged, winterized treatment plant with full automation and remote monitoring.
Outcome: Plant commissioned on schedule with 99.7% uptime in first year. Three local operators certified through a structured 6-month training program. ISC funding secured with full technical support.
Whether it's a compliance audit or a capital expansion, the work starts with a free 30-minute conversation.
Start the conversation →